Constructed channel improvements to protect City utilities and infrastructure. This included stabilization of the channel with rock grade controls, bank stabilization with the designed revetment, construction of a modular block retaining wall, and live stake restoration plantings.  This project utilized 24″ and 36″ rock for grade control and 48″ boulders in the stilling basin. The Big Block retaining wall totaled 1,175 SF